百家湖国际花园
Site map | Online reservation | Contact us  
 
 
 
 
 
  Project introduction
  Project introduction
  Geographic traffic
  Landscaping
 
 
eographic traffic
Here, going out is convenient
Through more than ten years development, todays high-quality community in Bai Jia Hu has formed quite mature facility network. Upon the fast traffic, three fast main roads of the city including Ning Ling Road (Shuang Long Avenue), Gong Qing Tuan Road, and the Airport Highway are connected to the main city. The renovation of Ning Ling Road has got into a stage of planning and design. The plans for the Highway around the city and
the South Station of high speed railway will greatly strengthen the contract between Jiangning and the main city.
The south extension of Line 1 subway has been determined to start construction at the end of 2006, and it is forecasted to be run in 2009. In Bai Jia Hu area, there will be two stops: Sheng Tai Road and Bai Jia Hu. A new subway era is going to come, going out will be more convenient, and the quiet life on the bank of the lake will be connected to the prosperity of the main city.
There are many buses, including Line 104, Line 102, Nan Jin Line, Line 2 bus of Jiangning, and Line 10 bus of Jiangning. These lines will ensure the citizens to go out conveniently.
Besides, the community buses will be open to citizens of the community for free when it is time to go to work or go home.
 
NANJING BAIJIA LAKE REAL ESTATE CO. COPYRIGHT | To-dream